A CMR carriage has three roles — sender, carrier and consignee — and the Convention gives each one specific duties and rights. Knowing which is which prevents the most common and most expensive misunderstandings about who is responsible for what.
The three roles
- Sender (consignor) — the party that contracts with the carrier to have the goods carried. Often, but not always, the company that owns or produces the goods.
- Carrier — the party that performs the carriage. There can be successive carriers; under the Convention each one that accepts the goods and the consignment note becomes a party to the contract on the terms of the note.
- Consignee — the party entitled to receive the goods at the destination.
A single company can wear more than one hat across its shipments. What matters on any given consignment note is which role each named party plays for that carriage.
The sender’s obligations
The sender carries the front-end responsibility for getting the shipment right:
- Accuracy of particulars (Article 7). The sender is responsible for loss or damage the carrier suffers because of the inaccuracy or inadequacy of the particulars the sender supplies — the goods description, marks, numbers, weight, and dangerous-goods or customs information.
- Customs and formalities documents (Article 11). The sender must attach to the consignment note, or make available to the carrier, the documents and information needed for customs and other formalities completed before delivery.
- Dangerous goods (Article 22). If the goods are dangerous, the sender must tell the carrier the exact nature of the danger and, if needed, the precautions to take. Where the carrier was not informed, dangerous goods can, in defined circumstances, be unloaded, destroyed or rendered harmless without compensation.
- Packing. The sender is liable to the carrier for loss, damage and expense due to defective packing of the goods, unless the defect was apparent or known to the carrier at takeover and the carrier made no reservations about it.
In businesses where dispatch is a side task, the sender’s responsibilities are often the most under-managed. Inaccurate weights, vague goods descriptions and missing customs documents are routine — and they shift risk back onto the sender.
The carrier’s obligations
The carrier carries the responsibility for the goods during the carriage:
- Check at takeover (Article 8). The carrier must check the accuracy of the package count, marks and numbers against the note, and the apparent condition of goods and packaging — and enter reasoned reservations where checking is not possible or defects are visible.
- Liability for the goods (Article 17). The carrier is liable for total or partial loss and for damage occurring between takeover and delivery, and for delay — subject to the Convention’s defences and special risks.
- Following instructions (Article 12). The carrier must follow the sender’s — and later the consignee’s — lawful instructions on disposal of the goods, within the Article 12 conditions.
- Delivery (Article 13). At the destination, the carrier must hand over the second copy of the consignment note and deliver the goods to the consignee against a receipt.
The consignee’s role and rights
The consignee is not a passive recipient — the Convention gives real rights and one critical responsibility:
- Right to delivery (Article 13). After the goods arrive, the consignee can require the carrier to hand over the second copy of the note and deliver the goods, against a receipt. If charges are shown as due, the consignee generally must pay them to obtain delivery.
- Right to enforce the contract (Article 13). If loss is established, or the goods have not arrived after the Article 19 period, the consignee may enforce, in their own name, the rights arising from the contract against the carrier.
- Reservations at delivery (Article 30). This is the consignee’s key duty. Apparent loss or damage must be reserved at delivery; non-apparent loss or damage in writing within seven days; delay claims need a written reservation within twenty-one days. Miss the window and the goods are presumed delivered as described in the note.
The consignee’s reservation at delivery is the single most important evidence event in the whole carriage. A delivery confirmed with the right reservations — or confirmed clean — records the condition in which the goods were delivered. A delivery where nobody recorded anything leaves every later claim to argument.
Where responsibility shifts — the handover points
Responsibility for the goods moves at two moments:
- Takeover — the carrier’s period of responsibility begins. The carrier’s reservations (or lack of them) set the baseline condition of the goods.
- Delivery — the carrier’s period of responsibility ends. The consignee’s reservations (or lack of them) set the closing condition of the goods.
Between those two points, under Article 17, the carrier is in principle liable. The consignment note, properly completed at both ends, is prima facie evidence of the condition of the goods at each handover, and so helps determine who must answer for any difference.
What it is NOT
- The consignee is not just a signature at the end. The consignee has enforceable rights and a strict reservation duty.
- The carrier is not automatically liable for everything — the Convention provides defences and “special risks”.
- The sender is not free of responsibility once the truck leaves — inaccurate particulars and missing customs documents remain the sender’s risk.
Common mistakes
- Senders letting the carrier “fill in the CMR” — then carrying the liability for whatever was written wrong.
- Carriers signing at takeover without reservations the situation called for.
- Consignees signing delivery clean when there was visible damage — which weakens their evidence position.
- Nobody tracking the Article 30 windows, so a valid claim dies on a deadline.
FAQ
Who is the “sender” on a CMR? The party that contracts with the carrier for the carriage — often the company sending its own goods, but it can be a different contracting party.
Is the carrier always liable for damage? The carrier is liable in principle for loss, damage and delay during the carriage, but the Convention provides defences and special risks that can relieve liability.
What must the consignee do at delivery? Take delivery against a receipt, check the goods, and record reservations for any apparent loss or damage at delivery — or, for non-apparent damage, in writing within seven days.
Who is responsible for customs documents? The sender must attach or make available the documents and information needed for customs and other formalities; the carrier is not obliged to verify them.
Key takeaways
- The CMR allocates duties across three roles — sender (front-end accuracy), carrier (custody and check), consignee (reservations at delivery).
- Responsibility shifts at two moments — takeover and delivery — and a reasoned reservation (or lack of one) at each weighs heavily on who is liable.
- The consignee’s Article 30 reservation at delivery is the single most important evidence event in the whole carriage; missing the window flips the presumption against the claimant.
Related: What is a CMR? · How the CMR waybill works · Mandatory CMR fields · Liability, claims and deadlines